Wednesday, 17 September 2014

Week 2 Semester 2

Finalize the equipment.


For the second week in semester 2, I have decided to finalize my equipment that I want to use in this project. The equipments are, Frame, 4 Motors, 4 Electronic Speed Controllers, Controller (Transmitter/Receiver), 4 Propellers, Boards (Power Distribution Board), Wire/ Connector, Battery and Battery Charger. 

No comments:

Post a Comment